Bathroom Renovation – A Step by Step Guide

Bathrooms are one of the tiniest rooms inside your home and they’re also one the costliest to renovate. Bathroom renovation is a job that, if done well, can truly add value to a home and a great space packed with design and light.

Bathroom design

Bathroom design is the first section of your bathroom renovation you will need to get right. Just replacing the existing bathroom with the same design might not be enough. The main element to great bathroom design is to create it with the people who are going to make use of it at heart. However make certain that your bathroom design also offers an over-all use factor as well. For instance: If you were designing your bathrooms for families you could still design the toilet with quick access to the bathtub and bath. This might ensure that the design would also work for individuals with limited mobility. This means if you decide to sell your home or if you are renovating for earnings your design has a wider market charm. Great bathroom design also uses the area well, taking into account the light or window space, size of fittings, and drainage options. Draw out a plan to size and right down the sizes of your room. Symbol the prevailing drainage things and then and drinking water inlet points. Write down a wish list of the toilet fittings to need and want using their sizes. Now marry both together and see what fits. Be aware: Most bathroom drainage and water inlet factors can be migrated but this does indeed come at extra cost.

Bathroom remodel

When you have made a decision to do the task yourself or area of the work it’s time to hire a neglect bin and pull out the old bathroom. When your home was made pre 1980 you might have fibro bathroom wall membrane linings with asbestos in it and great care and attention should be taken. You’ll need some full body disposable overalls, eye cover, and quality dust particles mask. Check with your local building authority or council regarding the rules on bathroom asbestos wall structure lining removal.

Remove everything except the plumbing. In the event that you keep carefully the bathroom plumbing set up you will not have to carefully turn water off for your house. You also should jack hammer the ground tiles up and the sand and concrete bed they are laid on.

bathroom conversions Sheffield and construction

Bathrooms must be engineering properly from the ground up to ensure that the done job is accurate and true. This also ensures the design and appearance of the bathroom will have a great finish

The Bathroom Reconstruction Process

Install normal water and drainage tube and electric powered wires.
Install wall coating and ceiling and then set up the bathroom hob and bathroom.
Waterproof the ground and shower and bath recess.
Correct nov the floor with sand and concrete ready for tiling.
Lay floor and wall structure tiles and then grout.
Install new bathroom vanity, fittings, and taps – install new electro-mechanical.
Paint ceiling and last clean.
Step one – Plumbing and electrical
At this time new plumbing is installed for clean hot and cool water and drainage. Careful attention needs to be studied when setting the new plumbing so that the plumbing fittings are accurate when the tiling is completed. For instance: To centre a fitting in a bathtub recess you must consider the thickness of the wall table, tile glue and tile so the installing will be centred after the tiles are set up. The same applies to putting in drainage pipes for a toilet; the wall membrane lining and tile thickness must be studied into account therefore the pipe is in the right position when the toilet is installed after tiling. Also hard in the any new electrical power wires without connecting them to the mains ability.

Second step – Install wall membrane and roof linings

Install your 6mm wall membrane coating being careful to nail the fibro table every 150mm without nailing into the new pipes and electrical wires. The simplest way is to assess and recognise the tube and wire design onto your new wall panel with a pencil as you go. Screw up (or nail) the roof lining, plasterboard is the most frequent. However if you are laying your tiles from floor to roof do not install the cornice as this is best done after tiling. If you’re not tiling to the roof go on and mount the cornice following the wallboard and ceiling lining have been installed. Also if your bath tub is not freestanding now you can make up the structure and mount the shower. Ensure the bathroom is installed effectively allowing for the thickness of the tiles and glue.Be sure to check all linings and pipes before you continue with your bathrooms renovation.

Third step – Waterproof your bathrooms

Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the ground ensure that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm above the bathtub rose wall plug. Also the bathtub should be waterproofed 100mm above the lip of the bathroom right around and also to the floor. On the doorway install a 25 x 25mm metal angle glued into place with quality silicone and waterproof in to the lip. Your whole bathroom should now the tanked, so the all water is only going to go down a drain. Bathroom waterproofing idea: waterproofing is a fairly easy job but quality and accuracy and reliability is most significant.

Fourth step – Lay in the concrete screed for the floor.

Prior to the floor tiles can laid the ground must be smooth and fairly even with hook show up to the drainage shop. To get this done you must use sand and concrete mix and it is best to put in a waterproofing agent into this as well. With a level, set the ground level at the doorway. Utilize the top aluminum position as the finished floor level and solution down the thickness of the tile plus 10mm for the glue. Make right around the toilet with a level and then screed in your sand and cement mixture with a 1 to 3 level fall to the most notable of the drain outlet. Invest some time and obtain it right with the completed level as soft as possible. If the sand cement mixture has place but is not dry out (you can walk on it nevertheless, you it continues to be a bit tender) rub it over with a residence brick. This can remove all the small highs and lows and talk with a level as you go. Let the bathroom floor totally dried up and then you ought to have a great surface to tile onto. Idea: the greater work you placed into the ground screed the easier your tiling will be.

Step five: Tile floor and walls

Place your tiles on the floor first and then grout. Then lay down your wall membrane tiles ensuring they are simply level as you lay. After the bathroom tiles have been minimize and laid, grout your entire tiles and then buff the tiles clean.

Step six: Install plumbing appropriate and fixtures

Install all your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity making certain it is level and covered around the most notable with silicone and also seal around the bath. Hint: get them to in the right place before you drill into your tiles.

Step seven: painting, and cleaning – enjoy

Paint your ceiling and execute a final clean ensuring everything is fitted correctly and that we now have no leaks in your plumbing. – Enjoy your brand-new bathroom.